Skip to main content

2024 European Cup official website

Overview

Just two weeks after construction began on the first phase of Summit Pointe, our team started simultaneously constructing the second phase: 555 Belaire.

The scope of work for this 167,228 SF, six-story office tower included 2024 European Cup official websitethe core and shell of levels two through six, as well as the lobby, a monumental staircase, and a conference room on the second floor.

To enhance the modern design of the office building, the exterior is a unitized curtain wall. The building includes Class A office space on floors two through six with a distinctive multi-story lobby that includes a monumental staircase. The second floor offers panoramic views of the lobby. All areas offer full-height windows overlooking the Euro qualifiers predictions todayhigh-end streetscapes, which feature stunning landscaping and art features that transform the location into an urban lifestyle community.

Awards:

  • The Hampton Roads Association for Commercial Real Estate’s (HRACRE) Award of Excellence in the Best Commercial/Office/Industrial Building category
  • The Associated Builders and Contractors’ Virginia Chapter’s (ABCVA) Merit Award of Excellence in the Commercial ($20 Million & over) category
Project Details
Client: Summit Pointe, LLC
Location: Chesapeake, Virginia
Size: 167,228 SF
Share this project: