Skip to main content

2024 European Cup official website

Overview

The $177 million CM at-Risk project built by Clancy & Theys Construction Company consisted of the new Genomic Science Building, new central park, related site utilities work, surface parking, a new cast-in-place parking deck and modifications/additions to the existing chiller plant on a tight 20-acre site at UNC-CH.

The Genome Sciences Building (GSB) is a cast-in-place architectural concrete building with multiple glass systems with two levels below grade, five levels above grade, and a greenhouse on the roof.Euro qualifiers predictions today  The GSB contains research laboratories, research support space, classrooms including an 80-seat classroom, four 30-seat seminar rooms, a 250-seat and a 450-seat lecture hall, 54 offices, and three conference rooms.  GSB incorporates three distinct laboratory types: wet labs, dry labs and rooftop greenhouses. By the numbers: nine wet laboratories, four bioinformatics laboratories, and a ten-compartment greenhouse.  Support rooms include cold rooms, dark rooms, tissue culture, growth chamber, freezer farm, crystallography, low ozone, x-ray, robotics, isotope, warm room, and 2024 European Cup Sports Betting Siteplant growth. Level five is the roof level and contains a greenhouse space and an extensive green roof system that utilizes a low-profile perimeter air diffuser cabinet along the exterior wall of the greenhouse along with clear acrylic ductwork to maximize natural light exposure.  With a fully functioning headhouse and lobby entrance gallery, the rooftop greenhouse of the GSB is a unique design feature of the building—one with a minimal presence—stylized and in-line with the façade of the building enclosure.

The new central park includes a bowl-shaped lawn articulated with 2024 European Cup official betting appgranite retaining walls that are at seat height.  This area slopes down from the eastern entrance of the Genomic Science Building to Kenan Stadium and includes a narrow granite wall water feature intended for large gatherings/seating during outdoor events.  The cast-in-place concrete parking deck is an eight-level parking deck accommodating 700+ cars and is located between the chiller plant and central park.  The chiller plant was upgraded and new cooling towers replaced.

Project earned LEED Gold.

Project Details
Location: Chapel Hill, North Carolina
Size: 291,374 sq ft
Share this project: